We installed a 15 kW submersible pump and 76mm Flexibore 200 series x 40m deep.
All that was required was basic equipment including a crane on truck to lift the pump.
Pictures illustrating installation of FLEXIBORE system...
![]() |
![]() |
![]() |
![]() |
![]() |
This took 35 minutes with 2 operators.