Flexiline™ Supporting Dam Rebuild and Flood Control in the Philippines 

Abrasion-resistant layflat hose enabling efficient slurry transfer for dyke rehabilitation projects

Power Profile

Overview:

Following severe flooding in Zambales Province, the Department of Public Works and Highways required an efficient solution to support dyke reconstruction. Crusader Hose supplied Flexiline™, enabling fast and reliable slurry transfer for Geotube-based embankment construction.

Customer:

Department of Public Works and Highways (DPWH) / HPL General Construction / Power Systems Inc.

Location:

Philippines

Industry:

Industrial

Application:

Water Transfer

Department of Public Works and Highways (DPWH) / HPL General Construction / Power Systems Inc.

Challenge:

Severe monsoon rains caused extensive flooding and soil erosion, leading to:

  • Collapse of protective embankments
  • Displacement of local communities
  • Increased risk of future flooding

 

The rehabilitation project required:

  • Efficient transfer of high-density slurry (60% solids)
  • Handling of abrasive materials (sand, gravel, saltwater)
  • Fast deployment to meet project timelines
  • Safe and flexible pipeline setup in a construction environment

 

Traditional rigid pipe systems would have been heavier, slower to deploy, and less adaptable to site conditions.

Solution:

Crusader Hose supplied Flexiline™ layflat hose, specifically suited for abrasive slurry applications.

The system included:

  • 4 × 25 m lengths of 6” Flexiline™ hose
  • Bauer couplings for secure and efficient connections
  • Integration with Atlas Copco WEDA L70 slurry pump
  • Connection to Geotube dewatering containers

 

Key advantages of Flexiline™:

  • Abrasion-resistant TPU lining, ideal for sand and slurry
  • Flexible and lightweight, enabling easy handling
  • Rapid assembly, reducing setup time
  • Capability to handle required pressures (35 psi)
  • Adaptability to changing site conditions

 

The pipeline was assembled on-site and connected between the slurry pump and Geotubes for continuous operation.

Results:

The Flexiline™ system delivered strong project outcomes:

  • Pipeline assembled in ~1 hour
  • Each Geotube filled in ~2 hours
  • Safer and easier handling compared to rigid pipe systems
  • Improved efficiency in slurry transfer operations
  • Dyke rehabilitation completed in 6 months
  • System reused on additional project sites, proving reliability

 

Customer feedback:

“We recommended Flexiline because we were confident it could handle high-density abrasive materials… We were happy with the result.”
— Power Systems Inc.

Gallery

Related Products

Flexiline™

Hamersley™ Reel System

Bayswater™ Mobile Hose Crate 1000

Industrial Couplings

Seraphinite AcceleratorBannerText_Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.